Installation instructions, 18 electrical connection and working test – Zanussi ZHC 916X User Manual

Page 18

Advertising
background image

18

Electrical connection and working
test:

1.

Remove the metal cover by unscrewing the four
self tapping screws.

2.

Connect the ‘Push-Fit’ connectors coming from
the fan assembly to the canopy.

3.

Position the terminals as illustrated under the
cover and replace the cover with the four self
tapping screws.

4.

Once the electrical connection has been
completed, check that the worktop lighting, fan
motor and the speed selection is working properly.

5.

Replace the charcoal filter (if the hood is to be
used in the recirculation mode) and the metal
grease filter cassette.

INSTALLATION INSTRUCTIONS

S07_24

S07_34

Advertising