Inst allation - external blower prep aration, Ext. blower, Hood – Zephyr CPA-E48ASX User Manual

Page 15

Advertising
background image

15

www.zephyronline.com

Install the supplied round transition collar to the
previously installed cover/round transition support
plate. Align and attach with 2 screws securely.

EXTERNAL BLOWER ELECTRICAL CONNECTION
- PRELIMINARY OPERATIONS

Installing the external blower junction box

Remove the electrical knock out on the upper panel.
See diagram below.

Connect the supplied 9 pin male molex plug from the
external blower wiring to the 9 pin female molex plug on
the control board housing. Route wire end through
hood and terminate in external blower junction box. See
diagram below.

Inst

allation - External Blower Prep

aration

EXT.

BLOWER

REMOTE FAN UNIT

JUNCTION BOX

BLACK (HIGH)

RED (LOW)

WHITE (COMMON)

BLUE (MED)

Y/G (GROUND)

HOOD

= CONNECTION WIRE TO WIRE

BLACK

RED

WHITE

BLUE

Y/G

CONDUIT

WIRES

RED (LOW)

Y/G (GROUND)

BLACK (HIGH)

BLUE (MED)

WHITE (COMMON)

Connect the eyelet terminal of the yellow/green conductor
to the grounding screw located inside the hood.

Remove the cover of the junction box.
Run electrical conduit to junction box and secure with
listed conduit fitting. Carry out the electrical connections.
Reinstall the junction box cover.

Upper outlet
(Vertical discharge)

Knock-out
Junction box
(Mains connection)

Knock-out
(External Blower
connection)

Install the external blower junction box with 4 screws.

Advertising
This manual is related to the following products: