Inst allation - inst alling the duct covers – Zephyr CPA-E48ASX User Manual

Page 18

Advertising
background image

18

13. Optional duct cover installation:

a. Remove the support bracket from the Duct Cover
assembly and attach it to the ceiling with 2 drywall
anchors and screws
Note: The printed index on the bracket must match
the center line previously drawn (See installation
step

2).

Conduit

Duct

Position
reference

Position
reference

CenterLine

Duct cover
support barcket

Inst

allation - Inst

alling the Duct Covers

Unscrew the 4 screws that fix the section of the Duct
Cover (Starting collar) and release all parts.
Install the upper section to the support bracket with
2 screws.
Note: Check that joined seam is positioned towards
the back.
Note2: The lower section (Collar) of the duct cover
assembly must be installed at the end of the
installation with 2 screws.

Support
Bracket

Upper
section

Lower
section
(Collar)

Advertising
This manual is related to the following products: