Installation –

Installing the Power Pack

1. Install blower into Power Pack

AK8200AS - Blower is pre-installed
AK8300ASX - Refer to page 11 for instructions

Remove support screw from top of Power Pack

before installing into cabinet. FIG 2b

2. Install 8” round adapter to top of Power Pack. See page 11, step 3

for instuctions.

3. Install optional AK08xxAS Stainless Steel Liner. Review manual

included with liner for more details.

4. If no liner is used cut out an opening in the bottom of the cabinet by

following the dimensions in FIG 1.

5. Lift Power Pack into opening and secure to bottom of cabinet using

(4) M4 stainless steel screws, (1) in each corner; see FIG 2.
Note: Wood blocking may need to be added to cabinet base if
additional support is needed.

6. Install duct work and seal with duct tape.

7. Install electrical.

8. Remove all packing materials before using Power Pack.

Switch power on and check for leaks around duct tape.

9. Install baffl e fi lters

CAUTION: At least two installers are

required due to the weight and size of the
hood.

!

Front View

Ductwork

minimum
3/4” wood base

elec.

metal or other non
combustible material

(4) M4 ss wood screws

(1) in each corner

Front View

Ductwork

minimum
3/4” wood base

elec.

cabinet bottom cut-out size

26

1/16” -

34

11/16

AK8200AS AK8300ASX

14

3/4

FIG 1

FIG 2

FIG 2b

remove support screw

C/L

C/L

Advertising
This manual is related to the following products: