Zephyr COK-E48SX User Manual

Page 11

Advertising
background image

In

s

ta

lla

tion

-

In

te

rn

a

l

B

lowe

r

9

5. Remove existing grounding screw and
attach grounding wire from capacitor box.

6. Re-attach grounding screw to finish
installation of capacitor box. Refer to Fig-A on
previous page.

7. Attach short capacitor connector to blower
connector.

8. Att ach long capacitor connector to control
board connector.

9. Use plastic tie to hold wiring together.

10. Remove wood block
Final view of internal blower install.

Continue to page “12” for hood installation instructions.

Advertising
This manual is related to the following products: