Ba c – Zephyr COK-E48SX User Manual

Page 15

Advertising
background image

13

In

s

ta

ll

a

ti

on

-

Mo

u

n

ti

n

g

H

o

o

d

gap between
bracket and
wall

Top

Bottom

1. Place wall bracket on line C. Position top of wall bracket so it is even with the 21” mounting spread. Make

sure bracket is attached to wall as shown in the diagram. The top of the wall bracket should have a gap between
it and the wall. The bottom should be flush against the wall. Use (3) 2” wood screws to attach bracket to wall. Use
anchors if not mountingto studs.

2. Lift hood onto wall bracket, there is a lip on the back of the hood which will rest on the wall bracket. Secure in

place by *screwing (2) screws with washers through hood into the wall. There are two holes at the bottom inside
the hood in which to do this.

3. Place telescopic duct covers on top of hood and extend top duct cover to the ceiling bracket. Attach duct cover to

ceiling bracket with the providedscrews.

4. Run duct work down to top of motor. Attach electrical wiring from ceiling to wiring on top of motor housing. (slide

duct cover up towards ceiling to gain access to the motor housing)

* Note

:

If installing onto drywall only with no wall studs present, attach E Z anchors (not provided) into the wall.

Please see page 15 for external blower installation instructions.

B

A

C

Attach screws to both
sides of the duct cove

rs

and secure to ceiling

bracket.

Electrical

10”

Advertising
This manual is related to the following products: