Installa tion - in ternal blo w e r – Zephyr Layers Wall ALA - M90ABX User Manual

Page 17

Advertising
background image

6. Attach the 6 pin male molex connector from blower

wire to the 6 pin female molex connector located
inside the blower housing. See Fig.6

7. Install blower and blower plate into blower housing

by following the reverse instructions from step 2
then use the screws provided to complete installa-
tion. (Tot. 14 type B). See Fig.7

8. Connect 9 pin male molex connector from blower wire to 9 pin female molex

connector on the capacitor wire. See Fig.8

WARNING! Place electrical wiring inside the motor housing.

The hood is now ready to be installed on the wall.

Installa

tion - In

ternal Blo

w

e

r

- 17 -

Advertising
This manual is related to the following products: