Xerox 701P47169 User Manual

Page 208

Advertising
background image

FreeFlow Process Manager Operator and Administrator Guide

2-156

Workflow Builder

6. In the Target Workflow drop down list, select a workflow.

Ensure that the workflow contains the process steps
necessary to support the job.

7. In the Submitting User drop down list, specify the user whose

repository credentials will be associated with the hot folder.

8. If required, select [Enable file clustering for this hot folder]

to enable the system to wait for the minimum number of files
before submitting them to the hot folder. This option is
available when Enable file clustering is selected in the Hot
Folder System Settings dialog.

Specify the number of files.

9. If required, select Enable scheduling for this hot folder,

available when Enable hot folder scheduling, and Set
scheduled times for hot folders individually
are selected in
the Hot Folder System Settings dialog.

In the Time of Day area, highlight minutes or hours and
click to specify the time during the day that you want the
hot folder scanned.

Select [Add] to display the designated time of day on the
Scheduled times list. A maximum of 10 scheduled times
can be set.

If required, in the Scheduled times area, select a time and
select [Remove] to delete the time from the list.

10. Select [OK] to accept the changes and close the dialog.
11. Close the Hot Folders window.

See also:

Limitations when setting up directories as input/output hot folders
for more than one feature

Advertising