Installation, Fitting the appliance and cabinet – Zanussi ZDG 58 User Manual

Page 42

Advertising
background image

INSTALLATION

Solid Pipe Installation

FITTING THE APPLIANCE AND CABINET.

1

Make suitable arrangements for gas and electrical supplies into the installation site. Preferably a junction
box or 3 pin earthed socket should be situated at the back of the cabinet below the oven.

2

The electrical connection to the appliance is at the rear bottom right hand side, the junction box or socket
should be positioned accordingly.

3

Fit cabinet as Fig. 1, making sure that it is level.

4

When unpacking the oven keep it on it's polystyrene base until it is put into the cabinet to avoid damage.

5

Remove the oven and grill doors
i)

Open door fully.

ii)

Engage both hinge locking pins (See Fig. 2).

iii)

To remove the door, clear the hinges by raising the door slightly whilst pulling towards you.

6

Remove the fascia panel .
i)

Remove the gas control knobs, springs, bezels and timer control knobs.

ii)

Remove the four screw (two each side) which are visible on the underside of the fascia. Fig. 3.

iii)

Tilt the bottom of the fascia panel out over. Withdraw the fascia panel by moving it down over to

disengage it from the top fixing lugs. Take care not to lose the 2 rubber grommets from the timer.

NOTE

:

The thermostat and grill discs will remain attached to the fascia panel. When refitting the control knobs

and bezels, the drive pins on the rear of the bezel must first be located in the disc carrier. The knob and
spring can now be fitted onto the control spindle. To prevent the top fascia panel mounts becoming slack, it
may be necessary to adjust the top fixing lugs.
7

Solid gas pipe installation:
i)

Remove the inlet elbow securing bracket and screws. See Fig.9. Slacken and remove the union nut
on the gas supply elbow on the right hand side of the control panel.

ii)

Remove the two screws on the gas inlet block Fig.5.

iii) Withdraw the gas inlet block and pipe assembly from the back of the appliance.
iv) Remove the union elbow from the inlet block and pipe assembly. The elbow will be required in the final

installation.

v)

The union elbow should be connected to the gas supply pipe via a standard ¼" B.S.P. straight
connector.

7

GAS INLET SUPPLY BLOCK

680

280

120

120

Fig.5

Advertising