User Manual
PSE2500-A3 External PoE
Power System

Chapter 4 Installation and

Debugging

4-3

Note that the PSE2500-A3 is shipped to the customer site mostly

pre-assembled so as to minimize the overall installation process. The

following installation sequence is recommended

z

Physical mounting

z

Installing rectifiers

z

Frame grounding

z

Connecting to loads

z

Connecting to AC utility/AC grounding

z

Initializing the system

4.2 Physical Mounting

All items needed for a site are contained within the packing crate.

The ordered rectifiers may be shipped separately. Please check the

packing list.

1) Place the crate in its vertical position near the installation

site.

2) Carefully remove the crate top and sides and then the

packing material. If possible, recycle the packing crate and

the packing material. If not, dispose of properly.

3)

Within the packing crate may be the following items: chassis,

rectifiers, and cables. Remove all this material and place

aside.

4)

Install the chassis into the 19-inch standard cabinet by using

eight pieces of M6 screws. Notes that use the electric

screwdriver and correct torque setting (recommend 6.2 to

6.5 N.m). See figure 4-1.