Periodic inspection, A. inspection procedures – ACR&Artex ELT to Nav Interface User Manual

Page 32

Advertising
background image

ARTEX PRODUCTS / ACR ELECTRONICS, INC.

DESCRIPTION, OPERATION, INSTALLATION AND MAINTENANCE MANUAL

453-6500

25-69-10

Page 32 of 58

APR 30/12

TASK 25-69-10-750-802

2. Periodic Inspection

SUBTASK 25-69-10-220-001

A. Inspection Procedures

(1)

Remove the ELT/NAV Interface in accordance with SUBTASK 25-69-10-050-001, on page 39.

(2)

Perform a visual inspection of the chassis exterior, checking for:

(a)

Damage to the finish,

(b)

Corrosion,

(c)

Excessive wear of the mounting holes, and

(d)

Cracks in the mounting flanges.

(3)

Perform a visual inspection of the mounting hardware for condition and corrosion.

(4)

Perform a visual inspection of the connectors, checking for:

(a)

Corrosion,

(b)

Bent or broken pins, and

(c)

Security of wires in the pins and pins in the connector socket.

NOTE: A slight tug on each wire will reveal a wire loose in the pin (i.e., bad crimp) or

an improperly seated pin in the connector socket.

(5)

Inspect the P2 interface wiring between the ELT/NAV Interface and the ELT for:

(a)

Security,

(b)

Evidence of damage, and

(c)

Evidence of insulation deterioration.

(6)

Inspect the P1 24-bit address wiring between the ELT/NAV Interface and ground or 24-bit

address switch block for:

(a)

Security,

(b)

Damage,

(c)

Insulation deterioration, and

(d)

Grounding points for corrosion.

(7)

Reinstall the ELT/NAV Interface in accordance with SUBTASK 25-69-10-450-002, on page 43.

Advertising