Test and fault isolation, Inspection and test regulatory requirements, A. united states – ACR&Artex C406-2 HM User Manual

Page 36

Advertising
background image

ACR ELECTRONICS, INC / ARTEX PRODUCTS

DESCRIPTION, OPERATION, INSTALLATION AND MAINTENANCE MANUAL

C406-2 (453-5000), C406-2HM (453-5001)

25-62-11

Page 36 of 87

JUN 20/13

TEST AND FAULT ISOLATION

TASK 25-62-11-750-801

1. Inspection and Test Regulatory Requirements

SUBTASK 25-62-11-990-001

A. United States

(1)

In accordance with FAR Part 91, Subpart C, § 91.207 (d), the ELT must be inspected within 12

calendar months after the last inspection for:

(a)

Proper installation;

(b)

Battery corrosion;

(c)

Operation of controls and crash sensor; and

(d)

The presence of a sufficient signal radiated from its antenna.

(2)

All maintenance shall be performed in accordance with FAR Part 43, Appendix D, which

requires the following inspections at each annual or 100-hour inspection:

(a)

ELT and mount for improper installation;

(b)

Wiring and conduits for improper routing, insecure mounting, and obvious defects;

(c)

Bonding and shielding for improper installation and poor condition; and

(d)

Antenna, including trailing antenna, for poor condition, insecure mounting, and improper

operation.

Advertising