Inspection and test procedures, A. checklist, Table 5 elt inspection and test checklist – ACR&Artex C406-2 HM User Manual

Page 38: B. preparation

Advertising
background image

ACR ELECTRONICS, INC / ARTEX PRODUCTS

DESCRIPTION, OPERATION, INSTALLATION AND MAINTENANCE MANUAL

C406-2 (453-5000), C406-2HM (453-5001)

25-62-11

Page 38 of 87

JUN 20/13

TASK 25-62-11-750-802

2. Inspection and Test Procedures

SUBTASK 25-62-11-990-001

A. Checklist

(1)

Table 5 provides a list of the ELT inspection and testing requirements, a copy of which may be

used as a checklist to verify inspection and test completion. The item numbers in the table

correspond to the item identifiers for each task.

NOTE: Items 5a through 5h are mandatory requirements only in Canada, in addition to

meeting the other inspection and test requirements listed in Table 5.

Table 5 ELT Inspection and Test Checklist

SUBTASK 25-62-11-000-001

B. Preparation

(1)

Remove the ELT in accordance with SUBTASK 25-62-11-010-001 on page 51.

(2)

Remove the battery pack in accordance with SUBTASK 25-62-11-050-001 on page 52.

ITEM NO.

DESCRIPTION

BY

1

Coax Cable and Wiring Connections Inspection

2

ELT Mounting Tray and Hardware Inspection

3

ELT Battery Pack Inspection

4

G-Switch Functional Check

5a

121.5 MHz Frequency Measurement

5b

Audio Modulation Check

5c

121.5/243.0 MHz Power Output Measurement

5d

406 MHz Frequency Measurement

5e

406 MHz Power Output Measurement

5f

Current Draw Test

5g

Digital Message Verification

5h

ELT Reset Check

6

Installed Transmitter Test

7

Antenna Test

8

Inspection and Test Documentation

Advertising