Installation – American Magnetics 4Q06250PS-430 High Stability Integrated Power Supply System User Manual

Page 38

Advertising
background image

20

Rev.

3

Installation

Power-Up Procedure

19. Turn off the power supply.

20. Reset the stability setting and ramp rate of the Model 430

Programmer to an appropriate value for the magnet to be operated.

Then turn off the Model 430.

21. Remove the short from the power supply leads and connect the

leads to the magnet current leads of the magnet.

After successful completion of this test, the system is ready for operation

with a superconducting magnet. Refer to the ramping function example

presented in section 3.14 on page 85 for a discussion of the various

available ramping methods.

Advertising