Spicer Single Speed Axle - Service Manual User Manual

Page 19

Advertising
background image

Figure 3-34

Step (36) Place arbor and discs (large diameter end) into

cross bore of carrier. Place pinion height block on button

end of pinion. Set dial indicator on height block (high step

of block). Set dial indicator at zero (0). Slide scooter gage

across or over arbor.

Indicator will read a plus (+) or minus (-) at its highest

point, depending on the etching of the pinion.

NOTE

Indicator reading within .002 (.05 mm) of etching is

considered acceptable. If pinion position is found to

be within specification, continue with build-up. If pinion

position is not within specification, change shim pack

thickness under inner bearing cup.

Remove pinion nut, washer, end yoke, and pinion.

Assemble preload shims onto pinion.

NOTE: If old shims are available, measure shim pack and

build up new shim pack using new shims of the same

thickness. If old shim pack is not available for reference,

build shim pack up to .060 (1.52 mm) thick. This will

provide a starting point and may require adjustment.

Figure 3-35

Step (37) Apply a light coat of hypoid lubricant on the lip

of pinion seal and assemble into carrier.

TOOL: 8152 Seal Installer

C-4171 Handle

Figure 3-36

Step (38) Assemble pinion, end yoke, washer, and new

pinion nut. Torque nut to specification.

TOOL: 6719 Yoke Holder

Torque Wrench

NOTE: Torque wrench must be capable of 500 lbs. ft. (677.9

N•m) torque.

Figure 3-37

Step (39) Using an in. Lbs. torque wrench as shown, rotate

pinion. Torque to rotate pinion should be within

specification. To increase preload, remove shims, to

decrease preload add shims.

3-10

Advertising