Veris Technologies Quad 2800 Soil EC Mapping System - Operating Instructions User Manual

Page 4

Advertising
background image

OM17-Quad2800

2-2


Figure 1. EC Surveyor kit

Figure 2. DataLogger kit

Use protective shipping/storage case to protect electronics components whenever electronics are
shipped. Keep all diagnostics and operations manual with system when mapping.

Mount instrument in a location that is as free as possible from dust, vibration, and electrical
interference. Display should be visible to operator and shielded from direct sunlight. Use
adjustable mounting brackets to position electronics for optimal visibility (Figure 3).


Figure 3.

EC
Surveyor

SD
card
reader

Mtg
bracket

Power
cord

Signal test
box

Mtg
bracket

Power cord

Signal test
load

Serial
cable

SoilViewer
software

Advertising