Veris Technologies Quad 2800 Soil EC Mapping System - Operating Instructions User Manual

Page 5

Advertising
background image

OM17-Quad2800

2-3

Figure 4. EC Surveyor (rear)













Figure 5. EC Surveyor (front)








Figure 6. DataLogger (rear)

Power port:
The Soil EC Surveyor is shipped
with an accessory power cord.
If an alternative connection is
desired, make sure that the unit
is properly connected to a power
connection that is not controlled
by the ignition switch. If
connecting directly to the
battery, we suggest a 3-amp in-
line fuse is installed between the
battery and the instrument.

EC Signal:
EC Signal Cable
extension from
implement attaches
to the EC Surveyor
here. Route cable
properly to prevent
damage. Signal test
load also attaches
here

—used to test

EC Surveyor.

EC Data out:
Attach serial cable
here and other end
to Sensor
DataLogger or
laptop PC.

GPS input:
Connect GPS cable here.
It is designed to accept
GPS input in NMEA 0183
format via an RS232
connector.
(GPS must send GGA and
either VTG or RMC strings
at a 1hz rate, at 4800 baud,
8 data bits, 1 stop bit, no
parity.)

On/Off:
Turns power to EC
Surveyor on and
off.

Power:
When lit, this red
LED indicates EC
Surveyor is powered
up.

Data Status:
When lit, this green LED
indicates data is being sent
out serial port. If not lit, EC
values are negative or GPS
signal not received.

Fuse:
This allows the fuse to be
replaced, with a 1A
fastblow fuse, if blown.

Advertising