VEGA VEGABAR 63 Foundation Fieldbus User Manual
Page 31
Advertising
Fig. 24: Mounting the indicating and adjustment module
Note:
If you intend to retrofit the instrument with an indicating and adjustment
module for continuous measured value indication, a higher cover with
an inspection glass is required.
VEGABAR
63 • Foundation Fieldbus
31
6 Set up with the indicating and adjustment module PLICSCOM
32464
-
EN
-081209
Advertising