interface.
Depending on the installation conditions, there can
be deviations which can be rectified with an
adaptation of the adjustment or a change of the
measured value offset in the DTM service mode.
L
0
-25 mm (-0.984
")
-10 mm (-0.394
")
10 mm (0.394
")
25 mm (0.984
"
)
0,2 m
(7.874
")
0,15 m
(5.906
"
)
0,15 m
(5.91
")
0,05 m
(1.968
")
1
1
Fig. 22: Deviation VEGAFLEX 67 in rod version
1
Dead zone - no measurement possible in this area
L
Probe length
L
0
-15 mm (-0.591
"
)
-10 mm (-0.394
")
10 mm (0.394
")
25 mm (0.984
"
)
0,2 m
(7.874
")
0,15 m
(5.906
"
)
0,2 m
(7.874
")
0,1 m
(3.937
")
1
1
Fig. 23: Deviation VEGAFLEX 67 in cable version
1
Dead zone - no measurement possible in this area
L
Probe length