interface.
Depending on the installation conditions, there can
be deviations which can be rectified with an
adaptation of the adjustment or a change of the
measured value offset in the DTM service mode.

L

0

-25 mm (-0.984

")

-10 mm (-0.394

")

10 mm (0.394

")

25 mm (0.984

"

)

0,2 m

(7.874

")

0,15 m

(5.906

"

)

0,15 m

(5.91

")

0,05 m

(1.968

")

1

1

Fig. 22: Deviation VEGAFLEX 67 in rod version

1

Dead zone - no measurement possible in this area

L

Probe length

L

0

-15 mm (-0.591

"

)

-10 mm (-0.394

")

10 mm (0.394

")

25 mm (0.984

"

)

0,2 m

(7.874

")

0,15 m

(5.906

"

)

0,2 m

(7.874

")

0,1 m

(3.937

")

1

1

Fig. 23: Deviation VEGAFLEX 67 in cable version

1

Dead zone - no measurement possible in this area

L

Probe length