2 mounting steps, 3 mounting steps, external housing – VEGA VEGABAR 55 Foundation Fieldbus - climate compensated User Manual

Page 14

Advertising
background image

14

4 Mounting

VEGABAR 55 • Foundation Fieldbus - climate compensated

39443-EN-130321

4.2 Mounting steps

For mounting VEGABAR 55, a welded socket is required. You can find

these components in the supplementary instructions manual "Welded

socket and seals".

Use the seal belonging to the instrument or a suitable, product-

resistant seal
Screw VEGABAR 55 into the welded socket. Tighten the hexagon

screw on the process fitting with SW 27 (spanner width 27 mm).

Warning:

The housing must not be used to screw the instrument in! Applying

tightening force can damage internal parts of the housing.

4.3 Mounting steps, external housing

1. Mark the holes according to the following drilling template
2. Depending on the mounting surface, fasten the wall mounting

plate with 4 screws

90 mm (3.54")

R 3,5 mm

(0.14")

3mm

(0.12")

70 mm (2.76")

8 mm

(0.32")

93 mm (3.66"

)

110 mm (4.33"

)

Fig. 6: Drilling template - wall mounting plate

Tip:

Mount the wall mounting plate so that the cable entry of the socket

housing points downward. The socket housing can be displaced by

180° to the wall mounting plate.

Warning:

The four screws of the socket housing must only be hand screwed. A

torque > 5 Nm (3.688 lbf ft) can damage the wall mounting plate.

Welding the socket

Sealing/Screwing in

Wall mounting

Advertising