8 switch-on phase – VEGA VEGABAR 55 Foundation Fieldbus - climate compensated User Manual

Page 24

Advertising
background image

24

5 Connecting to power supply

VEGABAR 55 • Foundation Fieldbus - climate compensated

39443-EN-130321

I2C

Display

1

1

2

5

6

7

8

Fig. 21: Wiring plan external electronics
1 Voltage supply

5.8 Switch-on phase

After VEGABAR 55 is connected to voltage supply or after voltage

recurrence, the instrument carries out a self-check for approx. 30

seconds. The following steps are carried out:

Internal check of the electronics

Indication of the instrument type, the firmware as well as the sen-

sor TAGs (sensor designation)

Status byte goes briefly to fault value

Then the current measured value will be displayed and the corre-

sponding digital output signal will be outputted to the cable.

2)

Wiring plan external

electronics

Switch-on phase

2)

The values correspond to the actual measured level as well as to the settings

already carried out, e.g. default setting.

Advertising