4 mounting, 1 general instructions, 2 mounting instructions – VEGA VEGABOX 03 User Manual

Page 9

Advertising
background image

9

4 Mounting

VEGABOX 03 •

45925-EN-131119

4 Mounting

4.1 General instructions

The VEGABOX 03 can be mounted in any position. However, vertical

mounting with the cable gland downward is recommended. This pre-

vents soiling of the breather facility and the ingress of moisture.

Protect your instrument against moisture penetration through the fol-

lowing measures:

Use the recommended cable (see chapter "Connecting to power

supply")

Tighten the cable gland

Loop the connection cable downward in front of the cable gland

This applies particularly to:

Outdoor mounting

Installations in areas where high humidity is expected (e.g. through

cleaning processes)

Installations on cooled or heated vessels

4.2 Mounting instructions

VEGABOX 03 with any available housing material is suitable for wall

mounting.

7 mm (0.28"

)

82 mm (3.23")

10 mm

(0.39")

Fig. 3: Drilling dimensions for the VEGABOX 03 for wall mounting

The VEGABOX 03 with plastic housing is suitable for direct carrier rail

mounting.

Installation position

Protection against mois-

ture

Wall mounting

Carrier rail mounting -

Plastic housing

Advertising