10 switch-on phase – VEGA VEGABAR 87 4 … 20 mA_HART - Operating Instructions User Manual

Page 27

Advertising
background image

27

5 Connecting to power supply

VEGABAR 87 • 4 … 20 mA/HART

45044-EN-131010

1 2 3 4

6

3

4

1

2

5

Fig. 27: Connection of the sensor in the housing base
1 Brown

2 Blue

3 Yellow

4 White

5 Shielding

6 Breather capillaries

5

1

2

+

( )

(-)

6 7 8

4...20mA

2

3

4

1

Fig. 28: Electronics and connection compartment, single chamber housing
1 Voltage supply/Signal output

2 For display and adjustment module or interface adapter

3 For external display and adjustment unit or Slave sensor

4 Ground terminal for connection of the cable screen

5.10 Switch-on phase

After connecting the instrument to power supply or after a voltage

recurrence, the instrument carries out a self-check for approx. 10 s:

Internal check of the electronics

Indication of the instrument type, hardware and software version,

measurement loop name on the display or PC

Indication of a status message on the display or PC

The output signal jumps to the set error current

Terminal compartment,

housing socket

Electronics and connec-

tion compartment

Advertising