Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1391 User Manual
Page 22
22
Assembly
PNEG-1391 8",10", & 12" BE-SAW Augers
A. Attach Transition* to B.E. Boot using 3/8"-16 x 1"
HHCS bolts, 3/8" lock washers, & 3/8"-16 Hex nuts.
B. Use a sling to lift the downspout end of the incline
tube assembly and position it directly over the tran-
sition opening.
C. Completely lower the tube until the spout flange
sits flat on top of the transition.
D. Install the spout flange to the top of the main inlet
hopper using four (4) 2" O.D. flat washers and 3/
8" nylon locknuts. The incline tube spout should
rotate on the top of the main inlet hopper.
*See next page for transition information.
5. ASSEMBLE 8", 10", OR 12" INCLINE TUBE TO BUCKET ELEVATOR BOOT (See Figure 5)
Swivel Spout
Weldment
Tube
Weldment
3/8" Nylock
Nut
3/8"
Washer
Transition
3/8"-16 x 1 HHCS
3/8" Lock Washer
3/8" Hex Nut
Bucket Elevator Boot