7 three phase power connections – R&M Materials Handling ELECTRIC CHAIN HOISTS LoadMate Chain Hoist LM 16-20-25 User Manual

Page 12

Advertising
background image

LM16-20-25 I&M MANUAL/EN/11.30.2010


12/73

This document and the information contained herein, is the exclusive property of R&M Materials Handling, Inc., and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials Handling, Inc.
Copyright © (2010) R&M Materials Handling, Inc. All rights reserved.

2.7

Three Phase Power Connections

Figure 2. Three Phase Control Box Power Connections

PS

PB

TR


PS – Power supply

TR – Trolley connection

PB – Pushbutton connection

1. Remove the control enclosure cover.
2. Insert the power supply cable through the cable gland or connector (PS).
3. Connect phases L1, L2, L3, and ground (PE) to terminal strip. Refer to the wiring diagram.
4. Tighten the terminal screws
5. Tighten the cable gland or connector to secure the cable.
6. Connect the pushbutton assembly to plug connector X23 (PB).
7. Connect the motorized trolley plug connector X24 (TR) (optional).
8. Close the control enclosure cover.















Advertising