10 chain container – R&M Materials Handling ELECTRIC CHAIN HOISTS LoadMate Chain Hoist LM 16-20-25 User Manual

Page 34

Advertising
background image

LM16-20-25 I&M MANUAL/EN/11.30.2010


34/73

This document and the information contained herein, is the exclusive property of R&M Materials Handling, Inc., and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials Handling, Inc.
Copyright © (2010) R&M Materials Handling, Inc. All rights reserved.

6.10 Chain Container

Figure 15. Chain Container Installation

m

CAUTION: Chain container must be in installed for effective operation of hoisting limit
switch.


Removing Chain Container (Figure 15)

1. Remove load from load block assembly.
2. Lower load block assembly to until a lowest point. This will remove weight of chain from chain

container.

3. Support chain container before removing chain.
4. Remove snap ring (item 3) from end of pin (item 1). There is a snap ring on each end of pin.
5. Pull pin (item 1) out while supporting chain container (item 4).
6. Remove chain container (item 4).

Installing Chain Container (Figure 15)

1. Place end of load chain into chain container (item 4). Position chain container (item 4) onto hoist

mounting bracket (item 2).

2. Align holes and insert pin (item 1) through container (item 4) and hoist mounting bracket (item 2).
3. Install snap ring (item 3) on end of pin (item 1). Verify that snap ring is properly seated in groove on

pin.

4. Raise load block and verify that chain is going into chain container without problems.

Advertising