GE Industrial Solutions MicroVersaTrip Plus and MicroVersaTrip PM AK-25 and AKU-25 User Manual

Page 4

Advertising
background image

4

SECTION 1 INSTALLING THE

WIRE HARNESS ASSEMBLY
(CONTINUED)

Wire Harness Connector Assembly and
Installation (Continued)

Step 3.

Slide the adapter bracket and connector assembly

over the guide pins of the programmer bracket.

Press the two (2) steel push nuts provided onto

the guide pins using a nut driver until the

assembly is held firmly against the programmer

bracket (Fig. 1d).

Step 4.

While holding the adapter bracket and connector

assembly firmly in place against the programmer

bracket, bend the two (2) locking tabs on the

programmer bracket into the mating notches on

the adapter bracket using a screwdriver (Fig. 1e).

Step 5.

Refer to the installation instructions provided with
the MicroVersaTrip Plus

or MicroVersaTrip PM

conversion kit to complete the wire harness

installation process.

Fig. 1d. Installing Push Nuts

Fig. 1e. Programmer Bracket Locking Tabs

Advertising