Ct assemblies installed into the breaker – GE Industrial Solutions ProTrip Conversion Kits DB-25, DBL-25, DB-50, DBL-50 User Manual

Page 13

Advertising
background image

2. Attach the support bracket provided to the top of the

trip unit mounting assembly with the

1

/

4

-20 x

3

/

4

" bolt

provided, as shown in Figure 23. Use the bracket as
a template to locate the position in the breaker frame
to drill a hole to accommodate a

1

/

4

" bolt.

3. Attach the support bracket to the breaker frame with

the

1

/

4

-20 x

3

/

4

" bolt provided, as shown in Figure 24.

The trip unit bracket should be parallel to the breaker
back frame.

NOTE: If an undervoltage device is present on the
breaker, it will have to be relocated.

Figure 22. DB-25 spring clamp installed on the breaker

frame.

Fig 23. Drilling the flux shifter support bracket mounting

hole.

Spring
Clamp

Spring

Figure 24. Installed flux shifter and trip unit mounting

assembly (DB-50).

13

Advertising