GE Industrial Solutions A-Series II Panelboards SE_TED User Manual

A-series, Ii panelboards

Advertising
background image

DEH40153

DEH40153 Rev.No.02

1

g

A-Series

®

II Panelboards

AD/AE/AQ Type P & N Power Panel
SE/TED Three-Phase Circuit Breaker
Kits

Introduction

These instructions describe the installation of SE/TED three-phase circuit breaker kit into
an A-Series

®

II panelboard. These kits are for use in panelboards ordered with Un-

Specified Space.
The catalog number for six-pole SE/TED breaker kit is ASPP6SE6D


Parts List for ASPP6SE6D

Table 1.

ITEM #

DESCRIPTION

PART #

QTY

1

BRANCH BASE FOR B PHASE

139C5702BSEG1

1

2

BRANCH BASE FOR A PHASE

139C5702ASEG1

1

3

BRANCH BASE FOR C PHASE

139C5702CSEG1

1

4 (SPOOL)

315A7036P18

6

5 (SCREW-SPOOL)

315A7037P3

6

6 (WASHER-SPOOL)

75A105503P111 6

7 (SCREW-BUS)

315A7034P8

6

8 3P

BRACKET

139C5500P82

2

9

SCREW, BKT TO RAIL

N667P16008B6

8

10

SCREW, C/B TO BKT

N80P150046B6

4

11

FILLER PLATE, SE/TED/FB

139C5503P77

1

12

SCREWS , #10-32 X 3/8

N722P16006B6

4

13 NUT

N210P16B6

6

14 CUP

WASHER

254V644P1

4


Installation

WARNING
: Before attempting to install one of these kits, remove all power from the
panelboard.

Use the following procedure to install a SE/TED circuit breaker kit. Call-out numbers in
the illustrations and numbers in brackets in the text refer to Item Numbers in Table 1.
Installation of a six-pole kit is illustrated in Figure 1 or Figure 2.

1. Remove the interior assembly from its packaging and verify that all parts are

present, as given in the parts list.

2. Remove the 8 screws (600A and 800A panels) securing the dead front to

panelboard interior. Lift off the dead front and place it and the screws aside.

Advertising