GE Industrial Solutions A-Series II Panelboards SE_TED User Manual

Page 3

Advertising
background image

DEH40153

DEH40153 Rev.No.02

3

7. Place the breaker assembled with spool over branch bases[1][2][3], align the

spool [4] with protruded opening in branch bases and tighten the three ¼-28 X 1

3

/

8

screws [5] installed in step 6 to 50-70 in-lb.

8. Insert two screws [10] into the holes in the circuit breaker and tighten to bracket

[8] with 18-22 in-lb.

9. Remove the four screws [12] of existing filler plate from dead front where

SE/TED breaker needs to be installed, as illustrated in Figure 2.

Figure 2. Removing the shield inserts from the shield for SE/TED breaker installation in
A-Series

®

II Panelboards.

10. Place the filler plate [11] over the dead front so that the four same-size holes line

up with the threaded holes of the dead front, as illustrated in Figure 3. Fasten filler
plate to the dead front with four #10-32 x

3

/

8

screws [12] tightened to 27-36 in-lb.

11. Reattach the dead front to the interior with the 8 screws removed in step 2.

Tighten the screws to 27-36 in-lb.

Advertising