GE Industrial Solutions A-Series II Panelboards SE_TED User Manual
Page 3
DEH40153
DEH40153 Rev.No.02
3
7. Place the breaker assembled with spool over branch bases[1][2][3], align the
spool [4] with protruded opening in branch bases and tighten the three ¼-28 X 1
3
/
8
screws [5] installed in step 6 to 50-70 in-lb.
8. Insert two screws [10] into the holes in the circuit breaker and tighten to bracket
[8] with 18-22 in-lb.
9. Remove the four screws [12] of existing filler plate from dead front where
SE/TED breaker needs to be installed, as illustrated in Figure 2.
Figure 2. Removing the shield inserts from the shield for SE/TED breaker installation in
A-Series
®
II Panelboards.
10. Place the filler plate [11] over the dead front so that the four same-size holes line
up with the threaded holes of the dead front, as illustrated in Figure 3. Fasten filler
plate to the dead front with four #10-32 x
3
/
8
screws [12] tightened to 27-36 in-lb.
11. Reattach the dead front to the interior with the 8 screws removed in step 2.
Tighten the screws to 27-36 in-lb.