GE Industrial Solutions ZBTE Series User Manual

Page 14

Advertising
background image

91

R

-1000

Page 12

Zenith ZTE/ZBTE Series Operation & Maintenance Manual

Figure 12
Connection Points for Universal Transformer Assembly (UTA)

Figure 13
Connection Points on Test Plug for Universal Transformer Assembly (UTA)

120VAC Aux Input

(customer supplied) (not obligatory)

(See Note 1)

24VDC output from

UTA to I/O relays

170VDC output
from UTA to
MX350 controller

Source 1
voltage input

Test points

Source 2

voltage input

24VDC Aux Input (ungrounded)

(customer supplied) (not obligatory)

(See Note 1)

Plug position

Test point

Plug position

Test point

20

TP1

19

18

TP3

17

16

TP5

15

14

TP7

13

12

TP9

11

10

9

TP2

8

7

TP4

6

5

TP6

4

3

TP8

2

1

TP10

Plug position

Test point

Test Connection Points

Value Measured

1

TP10

TP1-TP2

Line AC voltage input from Source 1

2

TP2-TP3

Voltage drop across R1

3

TP8

TP4-TP5

24 VAC to output from Source 1 to input/output relays

4

TP6-TP7

Line AC voltage input from Source 2

5

TP6

TP7-TP8

Voltage drop across R2

6

TP9-TP10

24 VAC to output from Source 2 to input/output relays

7

TP4

8

9

TP2

10

11

12

TP9

13

14

TP7

15

16

TP5

17

18

TP3

19

20

TP1

View looking into plug

UTA
metal
cover

UTA PC

board

Note 1: Both Aux inputs must be supplied from an uninterrupted power
source. Supplying only one Aux input may result in malfunction.

Advertising