GE Industrial Solutions ZBTE Series User Manual

Page 15

Advertising
background image

Zenith ZTE/ZBTE Series Operation & Maintenance Manual

Page 13

91

R

-1000

Figure 14
Universal Transformer Box Assembly (UTA) Schematic

V_A

R5

I/O’S

CUSTOMER

UPS (120VAC)

OPTIONAL FOR KEEPING

THE MX350 CPU ACTIVE

WITH LOSS OF SOURCE 1

OR SOURCE 2 POWER

(SEE NOTE 1)

FROM

FROM

TO MX350

CONTROLLER

CONTROLLER

TO MX350

POWER SUPPLY (PS)

D18

D19

D20

-

+

+

-

OPTIONAL FOR KEEPING THE INPUT AND OUTPUT STRIPS ACTIVE WITH
LOSS OF SOURCE 1 OR SOURCE 2 POWER (SEE NOTE 1)

NOTE 1: MUST BE SUPPLIED TOGETHER FROM AN UNINTERRUPTED POWER SOURCE

2

802

800

FROM

CUSTOMER

BATTERY

(24VDC)

(UNGROUNDED)

J4

1

2

1

+

-

170+

170-

J9

4

J12

2

3

1

MOV3

V_B

D26

D22

D23

D24

-

+

TROUBLESHOOTING

FOR SERVICE

TEST POINTS

REFER TO

ELECTRICAL

SCHEMATIC DWG.

SHEET 4

D17

TO TP10

18

16

14

12

J6

3

11

1

1

5

7

TO TP9

TO TP8

TO TP6
TO TP7

TO TP5

TO TP4

TO TP3

20

20

J3

10

9

31

30

3

1

Source 1

AC Voltage

Source 2

AC Voltage

J1

J2

21

20

3

1

V_A

V_B

TO TP2

TO TP1

V_B

V_A

0

TP3

TP4
TP5

TP6
TP7

TP6
TP8

TP7
TP8

TP9
TP10

17VDC

D21

17VDC

120VAC

120VAC

0

JP1

JP2

JP3

TP1

TP1
TP3

TP2

TP2

120VAC

120VAC

MOV2

MOV1

JP4

JP5

JP6

R4

R3

1

2

3

4

C1

MOV5

TP6

C2

12

11

R2

MOV4

D13

D14

D16

D8

D12

D4

D9

D10

~

+

-

5

6

7

T2

1

2

3

4

3

1

10 12

5

6

7

T1

~

R1

TP10

TP1

7

TP7

9

TP9

12

11

D25

TP8

D6

D5

D8

D7

D4

D3

D2

D1

-

+

TP5

TP2

7

9

TP4

D25

TP3

Advertising