Rack mount procedure – GE Industrial Solutions IT Series 600-2000VA User Manual

Page 23

Advertising
background image

Modifications

Reserved

19

OPM_ITS_USM_M06_M20_0US_V011 (09/2007)

Step 10.

Slide the batteries into the UPS. Allow enough working space to make the final wiring connections in step

below.

Step 11.

Final connections:

600 & 1000 VA: Connect the Black Wire as shown in diagram above.

1500 & 2000 VA: Connect the Red Wire as shown in diagrams above.

Step 12.

Install Metal Battery cover plate: Install metal plate with Phillips-head screws.

Step 13.

Re-Install Left front cover first by using the Phillips-head screws. Put the Right front cover on the Right side

first; press the left side into the UPS.

Step 14.

Battery replacement complete.

Rack Mount Procedure -

Step 1.

Remove front cover panel; pull out from the middle left. (See diagrams below)

600VA & 1000VA

1500 & 2000VA

Step 2.

Push front cover panel to the right slightly to allow front cover to be moved to the side. (See diagrams below)