1 preparation, 2 before you proceed, Basic components to install – Asus T4-P5945GCX User Manual

Page 18: Tool

Advertising
background image

2-2

Chapter 2: Basic installation

R

P5L13L-X Onboard LED

SB_PWR

ON

Standby

Power

OFF

Powered

Off

P5L13L-X

2.1

Preparation

Before you proceed, ensure that you have all the components you plan to install in

the system.

Basic components to install

1. Central Processing Unit (CPU)

2. DDR2 Dual Inline Memory Module (DIMM)

3. Expansion card(s)

4. Hard disk drive

5. Optical drive

Tool

Philips (cross) screw driver

The motherboard comes with an onboard standby power LED. This LED lights

up to indicate that the system is ON, in sleep mode or in soft-off mode, and not

powered OFF. Unplug the power cable from the power outlet and ensure that the

standby power LED is OFF before installing any system component.

• Use a grounded wrist strap or touch a safely grounded object or a metal

object, such as the power supply case, before handling components to

avoid damaging them due to static electricity.

• Hold components by the edges to avoid touching the ICs on them.
• Whenever you uninstall any component, place it on a grounded antistatic

pad or in the bag that came with the component.

2.2

Before you proceed

Take note of the following precautions before you install components into the

system.

Advertising