Assess roof thickness, Assemble duct – atwood Air Conditioners (non-ducted AC-1351, AC-1501) User Manual
Page 7
AC IOM 3/01/2013 rev 1
7
Roof Thickness -
Inch (mm) –
Include ‘H’
frame if used.
Duct length
required – Inch
(mm)
Hold down bolt
length required –
Inch (mm)
4.92 (125)
5.71 (145) as
supplied
As supplied
3.94 (100)
4.72 (120) - Cut
.98 (25)
As supplied
3.15 (80)
3.94 (100) –
Cut1.77 (45)
As supplied
2.36 (60)
3.15 (80) – Cut
2.56 (65)
Cut 1.97 (50)
1.57 (40)
2.36 (60) – Cut
3.35 (85)
Cut 2.76 (70)
1.0 (25) (absolute
minimum)
1.57 (40) – Cut
3.94 (100)
Cut 3.35 (85)
ASSESS ROOF THICKNESS
- Measure the roof thickness and consult the
table across to check if adjustments to the
hold down bolt and duct length are required.
Failure to cut the duct properly
can result in an incorrect seal which
will adversely affect the units
performance
ASSEMBLE DUCT
- Thread a hold down bar onto the M8 bolt and
push the bolt almost all the way into the hole in
each corner of the brace (Fig 9)
- Leave a .40 inch gap between the hold down
bar and the recess in the plastic brace. This will
allow for easier engagement with the four
corresponding threaded holes in the unit.
- Turn the assembly over and add the extension
duct to the top of the assembly (Fig 11).
- Take care to avoid tearing or ripping the duct
apart.
-
When attaching the duct to the
unit take care to ensure it forms a tight,
unbroken seal that doesn
’t allow
discharge air to escape.