2.1 Introduction

This section contains installation information, power requirements, initial inspection and signal connections for Model
4075 and 4078.


2.2 Mechanical Inspection

This instrument was carefully inspected before shipment. Upon receipt inspect the instrument for damage that might
have occurred in transit. If there is damage due to shipping, file a claim with the carrier who transported the unit. The
shipping and packing material should be saved if reshipment is required. If the original container is not to be used,
then use a heavy carton box. Wrap the unit with plastic and place cardboard strips across the face for protection. Use
packing material around all sides of the container and seal it with tape bands. Mark the box "FRAGILE".

2.3 Initial Inspection

After the mechanical inspection, verify the contents of the shipment (accessories and installed options). If the contents
are incomplete, or if the instrument does not pass the specification acceptance tests, notify the local service center.

2.4 Instrument Mounting

The Model 4075 and 4078 - Function Generators are intended for bench use. The instrument includes a front feet tilt
mechanism for optimum panel viewing angle. The instrument does not require special cooling when operated within
conventional temperature limits. The unit can be installed in a closed rack or test station if proper air flow is assured
for removing about 15 W of power dissipation.

2.5 Product Dimensions


300 mm

213 mm