CHIEF CM2C40 User Manual

Page 8

Advertising
background image

CM2C40

Installation Instructions

8

15. Align studs in faceplate with appropriate holes in faceplate

mounting bracket and hang faceplate on bracket with studs.

16. Secure faceplate to faceplate mounting bracket using two

locknuts. (See figure 7)

Figure 7

Cable Installation and Routing

The CM2C40 has an integrated cable management system that
allows cables to be automatically "fed out" as the lift lowers, and
"reeled in" as the lift raises while maintaining constant cable
tension.

NOTE:

Some components have been removed for clarity in

the artwork associated with this procedure.

IMPORTANT ! :

The CM2C40 requires minimum cable

lengths of 8 feet from display through lower mount.

To install cables:

1.

Remove two screws securing cable guide side cover.

2.

Set screws aside for reuse. (See figure 8)

Figure 8

3.

Slide cable guide side cover away from mount and carefully
set aside.

4.

Loosen three cable clamps. (See figure 10)

5.

Route cable(s) down through upper cable clamp.
(See figure 10) and (See figure 11)

Figure 9

IMPORTANT ! :

Evenly distribute cables between the four

upper clamp locations to prevent tangling of cables and
improper operation of CM2.

IMPORTANT ! :

Leave enough cable length available above

upper cable clamp to allow the routing and tie-down of cables
between upper cable clamp and display.

6.

Route cable(s) down through opening behind cable pulley.
(See figure 10) and (See figure 11)

CAUTION:

DON’T TWIST CABLES! Damage to cables

may occur if cables are twisted during cable management.

Ensure that cables on rear side of CM2 (gray) stay
towards rear side of cable pulley. (See figure 10)
and (See figure 11)

Ensure that cables on front side of CM2 (black)
stay towards front side of cable pulley. (See figure
10) and (See figure 11)

16

x 2

x 2

1

Cable guide
side cover

Cable guide
side cover

3

Advertising