5

Mount Installation

WARNING:

IMPROPER INSTALLATION CAN LEAD TO

MOUNT FALLING CAUSING SERIOUS PERSONAL
INJURY OR DAMAGE TO EQUIPMENT! It is the installer’s
responsibility to make sure the structure to which the PWR is
being installed is capable of supporting five times the
combined weight of the mount and all attachments.

1.

Determine mounting location taking into consideration
display size and mount movement.

2.

Using a stud sensor locate two wood studs 16” apart on
center. (See Figure 2)

3.

Using two people, place mount against wall and level mount
aligning mounting holes in upper and lower wall channels
with studs. (See Figure 2)

4.

Use a pencil mark four mounting holes making sure
mounting holes are located as close as possible to center of
studs. (See Figure 2)

5.

Drill four pilot holes where the mounting holes were marked
using a 7/32” (6mm) drill bit. (See Figure 2)

6.

Install two 5/16" x 2-1/2" lag bolts(G) and two 0.135" thick
washers (H), through mounting holes in upper wall channel
and into pilot holes. DO NOT tighten at this time.

7.

Using two people place mount against wall aligning
mounting holes in upper wall channel with lag bolts and
hang mount on lag bolts making sure washers are located
in front of mount.

8.

Adjust mount lateral position left until lag bolts are seated in
mounting slots in upper wall channel.

9.

Install two 5/16" x 2-1/2" lag bolts (G) and two 0.135" thick
washers (H), through mounting holes in lower wall channel
and into pilot holes. (See Figure 3)

10. Tighten all hardware. DO NOT overtighten!