Rigging and lifting procedures – ClimaCool UCR 30, 50 and 70 tons Manual User Manual

Page 11

Advertising
background image

11

www.climacoolcorp.com

Rigging and Lifting Procedures

Rigging (Figures 1 and 2)

Each module should be lifted by using lift straps threaded through the steel base cut outs and the use of a spreader bar.

Lifting and Transporting Modules (Figure 3)

Pallet jacks or forklifts are required for lifting and transporting the module. Each module has base cutouts provided for ease
of maneuverability.

Figure 1

Figure 2

Advertising