Pre-Startup

ŽŽ•–ƒ”–—’•—•–„‡’‡”ˆ‘”‡†„›Ž‹ƒ‘‘Žˆƒ…–‘”›
trained personnel.
Prior to chiller startup, there are certain
essential checks which must be completed. Failure to carry
out these checks could result in damage to the chiller
voiding the modules warranty.

Electrical

–‹•‹’‡”ƒ–‹˜‡–‘–—”‘ơ–Š‡ƒ‹‡Ž‡…–”‹…ƒŽ’‘™‡”•—’’Ž›
and follow proper lock-out/tag-out procedures prior to
servicing any of the chiller’s electrical components. The
ˆ‘ŽŽ‘™‹‰’”‘…‡†—”‡•…ƒ„‡’‡”ˆ‘”‡†‘Ž›ƒˆ–‡”–Š‡
‡Ž‡…–”‹…ƒŽ’‘™‡”‹•…‘Ƥ”‡†–‘„‡‘ơǣ

1.

The installation must be inspected and approved by the
respective agent and be in compliance with all local and
national electrical codes.

2. Š‡…ƒ†–‹‰Š–‡ƒŽŽ‡Ž‡…–”‹…ƒŽ–‡”‹ƒŽ…‘‡…–‹‘•

‘‡ƒ…Š‘†—Ž‡ƒ•”‡“—‹”‡†ǤUtilize any lock-out/
tag-out procedures required for your project location
when performing this operation. If no procedure exists,
take all precautions necessary to prevent the power
from being turned on. •›•–‡ƒ–‹…–‹‰Š–‡‹‰‘ˆƒŽŽ
–‡”‹ƒŽ•‹•‹†‡–Š‡‡Ž‡…–”‹…ƒŽ…‘–”‘Ž’ƒ‡Ž‘‡ƒ…Š
‘†—Ž‡•Š‘—Ž†„‡…ƒ””‹‡†‘—–ǤŠ‹•™‹ŽŽ‹…Ž—†‡–Š‡
…‘’”‡••‘”‘–‘”–‡”‹ƒŽ•ǡ™Š‹…Š™‘—Ž†”‡“—‹”‡
”‡‘˜ƒŽ‘ˆ–Š‡…‘’”‡••‘”–‡”‹ƒŽ…‘˜‡”Ǥ
Check
connections at each safety and every termination in
the panel.

3. Verify that a separate 115 volt power supply is used to

power the CoolLogic Control System. Field connections
ƒ”‡•‹’Ž‹Ƥ‡†”‡“—‹”‹‰‘Ž›ƒ–™‘…‘†—…–‘”•Š‹‡Ž†‡†
cable daisy chain from the Master Control Panel to the
modules. These control wires must be two-conductor
shielded having #18 AWG minimum up to 50 feet, #16
AWG minimum up to 100 feet, rated at 60°C minimum.
ŽŽƤ‡Ž†™‹”‹‰—•–„‡‹†‡–‹Ƥ‡†ȋ–ƒ‰‰‡†ȌǤ‡ˆ‡”–‘
Power Distribution Drawing on page 46.

4. ŽŽƤ‡Ž†…‘‡…–‹‘••Š‘—Ž†„‡…Š‡…‡†ˆ‘”–‹‰Š–‡••Ǥ
5. Check all fuses for proper sizing as indicated on the

chiller data plate and/or the electrical diagram on the
inside door of the electrical panel.

6. Verify proper operation of the ƒ†ƒ–‘”›Ƥ‡Ž†‹•–ƒŽŽ‡†

’”‡••—”‡†‹ơ‡”‡–‹ƒŽƪ‘™•‡•‘”Ǥ

7. ͖͔͜Ȁ͖͔͗—‹–•ǡ…‘Ƥ”–”ƒ•ˆ‘”‡”ȋ•Ȍƒ”‡’”‘’‡”Ž›

tapped for the measured incoming power supply.

8. Verify proper installation of the ƒ†ƒ–‘”›ˆƒ…–‘”›

’”‘˜‹†‡†ǡƤ‡Ž†‹•–ƒŽŽ‡†˜‘Ž–ƒ‰‡Ȁ’Šƒ•‡‘‹–‘”.

Refrigeration

1.

Refrigerant piping and components should be inspected
for damage.

2. Place refrigerant gauges on the discharge and suction

access ports of each refrigerant circuit to ensure a
refrigerant charge is present. Leave the gauges on for
compressor rotation check.

3. ‘Ƥ”–Š‡•‡––‹‰•‘ƒŽŽ’”‡••—”‡•‡•‘”•Ǥ

ƒ–‡”›•–‡

1.

‘Ƥ”–Šƒ–Ž‡ƒ–‡•–‹‰Šƒ•„‡‡…ƒ””‹‡†‘—–Ǥ

2. ‘Ƥ”–Šƒ––Š‡•›•–‡‹•…Ž‡ƒǤ
3. ‘Ƥ”–Šƒ–‡…‡••ƒ”›™ƒ–‡”–”‡ƒ–‡–•›•–‡•ƒ”‡

in place with both the evaporator and condenser
water systems.

4. ‘Ƥ”–Šƒ–„‘–Š–Š‡…Š‹ŽŽ‡†™ƒ–‡”ƒ†…‘†‡•‡”

water circulating pumps are operational and water is
ƪ‘™‹‰–Š”‘—‰Š„‘–Š‡š…Šƒ‰‡”•Ǥ

5. Shut the entering water valve and blow out some

water to check for particles or coloration from
•—•’‡†‡†’ƒ”–‹…Ž‡•Ǥ‡…‘”†–Š‡’”‡••—”‡†‹ơ‡”‡–‹ƒŽ
across the chiller and condenser heat exchangers,
measured at the pete’s ports at each module.

6. ‘Ƥ”…‘””‡…–™ƒ–‡”ƪ‘™”ƒ–‡•–Š”‘—‰Š–Š‡

condenser and evaporator. Acquire the design
parameters for the chiller bank from the ClimaCool
Selection Program data (available from the local
”‡’”‡•‡–ƒ–‹˜‡ȌǤ‘’ƒ”‡–Š‡‡ƒ•—”‡††‹ơ‡”‡–‹ƒŽ
’”‡••—”‡•ˆ”‘•–‡’͙ƒ„‘˜‡™‹–Š–Š‡’”‡†‹…–‡†ƪ‘™
”ƒ–‡•–‘‡•—”‡’”‘’‡”…‘””‡Žƒ–‹‘–‘–Š‡ƪ‘™”‡•—Ž–•Ǥ

7. Verify proper installation and electrical termination

Ž‘…ƒ–‹‘‘ˆ–Š‡ƒ†ƒ–‘”›ˆƒ…–‘”›’”‘˜‹†‡†ǡƤ‡Ž†
installed temperature sensors and wells ȋ•‡•‘”
should be fully inserted in the well)
and verify
calibration of sensors read through the CoolLogic
Control System.

8. ‘Ƥ”‹•–ƒŽŽƒ–‹‘‘ˆƒ†ƒ–‘”› Ƥ‡Ž†‹•–ƒŽŽ‡†

condenser and chilled water strainers with a
‹‹—‘ˆ͚͔‡•Š•…”‡‡•Ǥ

DANGER



‡ (OHFWULFVKRFNKD]DUG
‡ 0D\UHVXOWLQLQMXU\RUGHDWK
‡ 'LVFRQQHFWSRZHUVXSSO\ LHV 

EHIRUHVHUYLFLQJ

‡ 5HIHUVHUYLFLQJWRTXDOLILHG

VHUYLFHSHUVRQQHO

‡ 5LVTXHGHFKRFpOHFWULTXH
‡ 5pVXOWDWGHPDLGDQVGRPPDJHV

RXODPRUW

‡ 'HEUDQFKHUDYDQWGҋHQWUHSUHQGUH

OHGpSDQQDJHGHOҋDSSDUHLO

‡ &RQVXOWHUXQUpSDUDWHXUTXDOLILH

SRXUOHGpSDQQDJH

DANGER



&$87,21

$77(17,21





‡ 8QLWWREHVHUYLFHGE\TXDOLILHG

SHUVRQQHORQO\

‡ 5HIULJHUDQWV\VWHPXQGHU

SUHVVXUH

‡ 5HOLHYHSUHVVXUHEHIRUHXVLQJ

WRXUFK

‡ 5HFRYHUUHIULJHUDQWDQGVWRUHRU

GLVSRVHRISURSHUO\

‡ &RQILHUODPDLQWHQDQFHiXQ

WHFKQLFLHQTXDOLILH

‡ /HV\VWpPHIULJRULILTXHVRXV

SUHVVLRQ

‡ 'pFRPSULPHUDYDQWGҋH[SRVHUi

ODIODPPH

‡ 5pFXSHUpUOHIULJRULJHQHHWOH

VWRFNHURXOHGpWULUH
FRUUHFWHPHQW

RECOVER

REFRIGERANT

WARNING

This unit contains HFC-(R410A), an azeotropic mixture of R-32 (Difluoromethane) and R-125 (Pentafluoroethane).
DO NOT VENT HFC-(R410A) to the atmosphere. The U.S. Clean Air Act requires the recovery of any residual
refrigerant. Do not use R-22 service equipment or components on R410A systems.

WARNING!

To avoid possible injury or death due to electrical shock, open the
power supply disconnect switch and secure it in an open position
during installation.

CAUTION!

Use only copper conductors for field installed electrical wiring. Unit
terminals are not designed to accept other types of conductors.