PreStartUp R-410A SHC onDEMAND

®

10.22.2013

Project Name: _________________________________________________Date:___________________
Address: _____________________________________________________________________________

YES

NO

1. Are modules connected properly per Codes and Installation Manual?

___

___

(Installation, Operation & Maintenance Manual is available at

www.climacoolcorp.com

)

2. Does the module(s) nameplate voltage agree with the site voltage being supplied?

___

___


3. Is there a minimum of 60 mesh strainer on condenser and evaporator inlet water?

___

___

(Fill water to chiller being sure to pass through a minimum of 60 mesh strainer.)


4. Is condenser water system filled and flushed? (See “Filling the Water System” in ClimaCool IO&M.)

___

___


5. Is chilled water system filled, flushed and all air purged from system?

___

___

(Air must be purged from system prior to startup. See “Filling the Water System” in ClimaCool IO&M.)


6. Are all pumps tested and operational?

___

___


7. Is required GPM (verified by pressure differential) supplied to the chilled water side?

___

___

(See project specifications or selection and performance sheets available from ClimaCool Sales Rep.)


8. Is required GPM/Pressure differential being supplied to the condenser?

___

___

(See project specifications or selection and performance sheets available from ClimaCool Sales Rep.)


9. Are the pressure differential flow sensors or switches set to trip on the drop below required flows?

___

___

(Set to trip on low flow (less than 75% flow), not pump on/off.)


10. Have all chiller coupling connections been leak tested?

___

___


11. Is water presently circulating through chiller?

___

___


12. Verified that temperature sensors and voltage/phase monitor have been installed?

___

___


13. Verified power supply agrees with chiller nameplate?

___

___


14. Is power and communication wiring complete to each module?

___

___


15. Verify that wiring and devices meet with approved electrical submittal drawings?

___

___


16. Is required load available to run multiple compressors at startup?

___

___


17. Is control functional to maintain condenser water temperature?

___

___

(Includes maintaining “minimum” inlet temperature; see “Operational Limitations” in ClimaCool IO&M.)


18. Is a water header bypass installed at the chiller? _________ ClimaCool provided? _________Field provided? (Check one)


If you checked “No” to any question above, provide the line reference number and the date of scheduled completion below.
Please note all conditions must be complete prior to the startup date.

______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
This form must be completed and submitted to ClimaCool Corp. a minimum of three (3) weeks prior to final scheduling of any startup.
NOTE: If any of the above items are not complete at time of startup, back charges will be assessed for additional costs.

Contractor

Name:

___________________________

Address: ___________________________

_______________________________________________

___________________________

(Authorized Signature)

Phone:

___________________________

Date: _________________________________________

Pre Startup Check List (SHC onDEMAND

®

)