Water connection, Gas connection, Boiler exhaust connection – AAON BL-600 User Manual

Page 20: Warning, Caution

Advertising
background image

20

Water Connection
Connect the supply and return water lines.
The connection size is listed on the unit
rating sheet, along with the designed
volumetric flow rate. The maximum
operating pressure for AAON BL Series
units is 125 psi.





















Gas Connection
Size the gas piping to supply the unit with
proper pressure when all gas consuming
devices in the building connected to the
same gas system are operating. The
maximum gas train inlet pressure for all
boiler sizes is 5 psig. The minimum gas train
inlet pressure for the 500 MBH boiler is 5
inches of water column, and for all other
boilers, 7 inches of water column.

Carefully consider all current and future gas
usage. Table 3 details the input rate for each
boiler unit.

Gas connection sizes are listed on the unit
rating sheet.

Table 3 - Boiler Rated Input Capacity

Boiler Size

Rated Capacity (CFH)*

Natural

LP/Propane

500 MBH

500

200

750 MBH

750

300

1000 MBH

1000

400

1500 MBH

1500

600

*Note: Rating is for sea level conditions.

For additional information regarding the gas
piping

connection,

see

the

Thermal

Solutions Boiler “Installation, Operating,
and Service Instructions” that are included
with the unit.

Boiler Exhaust Connection
In addition to gas connection installation,
each boiler requires installation of the
exhaust vent piping and inlet vent hood. The
exhaust panel with chimney cutout is
removed for shipping, and replaced with a
shipping cover.

Remove the shipping cover and attach the
exhaust panel shipped with the unit. When
the exhaust panel is securely fastened with
sheet metal screws, locate the exhaust piping
that is also shipped along with the unit. The
exhaust piping that must be attached to the
internal exhaust vent piping includes the
vent length, 90 degree elbow and rain cap.

Examine

all

components

prior

to

installation. The female end of each vent
pipe component incorporates a sealing
gasket and a mechanical locking band.


Boilers must be operated only with
liquid flowing through boiler.

WARNING


PVC (Polyvinyl Chloride) and CPVC
(Chlorinated Polyvinyl Chloride) are
vulnerable to attack by certain
chemicals. Polyolester (POE) oils
used

with

R-410A

and

other

refrigerants, even in trace amounts,
in a PVC or CPVC piping system will
result in stress cracking of the piping
and fittings and complete piping
system failure.

CAUTION

Advertising
This manual is related to the following products: