Startup, Warning, Caution – AAON BL-600 User Manual

Page 24

Advertising
background image

24

Startup

(See back of the manual for startup form)





















Before the startup of the boiler be sure that
the following items have been checked.

1. Verify that electrical power is available

to the unit.


2. Verify that any remote stop/start device

connected to the boiler controller is
requesting the boiler to start.


3. Verify that liquid flow is present through

the boiler from the building.


4. There should be a building load of at

least 25% of the boiler capacity in order
to properly check operation.


5. With the main power switch off, review

the MCS Controller Manual provided
with the boiler. Understand the keypad
functions, how to set the leaving water
temperature setpoint and how to initiate
the Run State.

Use the general check list at the top of the
startup form to make a last check that all the
components are in place, water flow is
present, and the power supply is energized.

Using the controller keypad, individually set
the outputs in “Manual On” to confirm relay
closure.













Cycle on all the boilers to confirm that all
are operating within tolerance.

While performing the check, use the startup
form to record observations of boiler amps

When all is running properly, place the
controller in the Run mode and observe the
system until it reaches a steady state of
operation.

Note:

For

more

information

on

programming the controller refer to the
MCS Controller manual provided with the
boiler.









Electric shock hazard. Shut off all
electrical power to the unit to avoid
shock hazard or injury from rotating
parts.

WARNING


Improper

installation,

adjustment,

alteration, service or maintenance
can

cause

property

damage,

personal injury or loss of life. Startup
and service must be performed by a
Factory Trained Service Technician.

WARNING


Rotation must be checked on all
MOTORS of three phase units. All
motors, to include and not be limited
to pump motors motors, should all be
checked by a qualified service
technician at startup and any wiring
alteration should only be made at the
unit power connection.

CAUTION


Before completing installation, a
complete operating cycle should be
observed

to

verify

that

all

components are functioning properly.

CAUTION

Advertising
This manual is related to the following products: