Slide number 7, Gmc / chevy pickup 8 ft bed only, Tools required – Draw-Tite 41947 ULTRA FRAME RECEIVER User Manual

Page 7

Advertising
background image

GMC / CHEVY PICKUP

8 FT BED ONLY

TOOLS REQUIRED

9/16”, 3/4” SOCKET

21mm, 24mm SOCKET

11/16” DRILL BIT

TORQUE WRENCH

SAFETY GLASSES

SIDE BRACKET

CENTER SECTION

TRUCK FRAME

RAIL

M16 X 2.0 CL10.9

LOCKNUT

M16 X 2.0 BOLT

M16 X 2.0 CL10.9

LOCKNUT

SEE FRONT PAGE FOR CENTER

SECTION FASTENERS

NOTE:

General assembly - loosely install side brackets on vehicle (this page); install center section assembly and

tighten all fasteners to proper specifications (page 1)

63-87 GMC / CHEVY PICKUP 8 FT BED ONLY;

88-91 GMC / CHEVY CREW CAB PICKUP 8 FT BED ONLY

1. Raise and clamp hitch side brackets into position, by aligning side bracket to miss frame and suspension

components. Measurement from outside of side bracket to outside of other side bracket will be 34”.

2. Using the side bracket as a template, mark the frame at the center of each attachment hole.

Warning; Do not drill into fuel or electrical lines, take appropriate precaution before step 3.

3. Remove the side bracket and drill 9/16” holes in frame. Hint; a small pilot hole is recommended.

4. Install side bracket loosely with the fasteners shown above.

5. Raise center section of hitch for vehicle requirements. Install center section with (8) 9/16” x 1-3/4” bolts,

washers, and flanged locknuts.

6. Tighten hitch side brackets to center section. Tighten hitch side brackets to truck frame.

Advertising