To provide for optimum system performances the following guidelines
should be observed:

1. Before use, confirm the fluid to be used is compatible with the meter.
2. The flowmeter must be installed so the shafts of the rotors are

horizontal, never vertical or “on end”. Severe damage to components
may be the result, (See Figure 2-1).

3. A mesh strainer should be installed upstream and adjacent to the

flowmeter to protect it from foreign matter such as dirt, pipe scale,
or welding splatter.

Table 2-1 Maximum Particle Size and Recommended Strainer Mesh

Figure 2-2 Hall Effect Sensor Connections

Strainer Recommendations

Model

Max Partical Size

Strainer Size

BM04

0.011" (0.28mm)

60 Mesh

BM07

0.011" (0.28mm)

60 Mesh

BM10

0.011" (0.28mm)

60 Mesh

BM40

0.015" (0.38mm)

60 Mesh

BM50

0.018" (0.46mm)

60 Mesh