Assembly, Preparatory work, Fluid control systems – Burkert Type 2712 User Manual

Page 8: Benennung, 2/2-wege-handschrägsitzventil, Fig. 3”)

Advertising
background image

8

Assembly

+ 1.5 mm valve opening

Valve opening in mm

Valve opening in 1/10 mm

Valve opening in
1/100 mm

Fig. 3:

Position indicator handwheel

6.4.1. setting the position indicator

The display has been set at the factory so that the value 0,000 is
shown when the valve is tightly closed.
Any valve position can be defined as the zero position:

Move valve to the required position by turning the handwheel.

Loosen the 3 setscrews on the circumference of the locking ring.

Set display by simultaneously holding the handwheel and turning
the locking ring to the value 0,000.

Clamp locking ring with the 3 setscrews.

7. assembly

Danger!

risk of injury from high pressure in the system.
• Before loosening lines or valves, turn off the pressure and vent

the lines.

7.1. preparatory work

Observe flow direction (see type label).

Clean pipelines (sealing material, swarf, etc.).

devices with welded body:
Remove the actuator from the valve body:

Open valve by approx. 2 revolutions (to relieve the valve seat seal)

Place a suitable open-end wrench on the wrench flat of the nipple.

Unscrew the actuator off the valve body.

devices with socket body:

Only disassemble the actuator if required by the customer.

english

Types 2000, 2012, 2702, 2712

Advertising
This manual is related to the following products: