AMABILIA DOUBLE O-RING GEOTHERMAL FLOW CENTERS DORFC-2 User Manual

Page 15

Advertising
background image

Manual 2100-518B

Page

15 of 30

GROUN

D

FU

LL

P

OR

T B

AL

L

VALVE FOR BALANCING

LOOP

4. All units must include P/T ports for flow rate measure and balancing.

FIELD SUPPLIED

MIS-2664

NOTE

S:

1. Piping is shown schematically. Actual pipe diameter and layout must be determined before installation. 2. Pressure drop calculation must be made to verify that parallel pumping arrangement provides enough head to deliver design f

low rate to each unit

when all units are operating. 3. Flow controller should be mounted close enough to unit to maintain short (aprox. 10 ft., 3m) hose kit from Flow Controller

to unit.

FIELD SUPPLIED CHECK VALVE TO PREVENT SHORT CYCLING

EACH HEAT PUMP MUST INCLUDE P/T PORTS TO VERIFY FLOW RATES

fi

G

ure 6

mul

ti

P

le unit c

O

nnecti

O

n t

O

sin

G

ular

G

r

O

und l

OOP

Advertising
This manual is related to the following products: