Caution, Flow center mounting – AMABILIA DOUBLE O-RING GEOTHERMAL FLOW CENTERS DORFC-2 User Manual

Page 7

Advertising
background image

Manual 2100-518B

Page

7 of 30

nOtice

The Flow Center must be mounted with the pump shaft in

the horizontal position. In other words, it should always be
mounted in a vertical position (not on its back or mounted to
the ceiling). See Figure 3.

The pump should be located as close to the unit as possible
to limit the length of rubber hose kit or interconnect piping
and thus its associated pressure drop.

stud wall

Mounting on stud wall with or without drywall can be
accomplished by using two (2) lag bolts through the top and
bottom center holes directly into the stud. See Figure 4A.

cOncrete/masOnry wall

Mounting onto a concrete wall can be accomplished
typically using four (4) 1/4" diameter tapcon cement screws
in the four (4) outer corner mounting holes. See Figure 4B.

side Of unit

Mounting on the side of the unit is possible, but
not necessarily recommended because it can inhibit
serviceability and also lead to vibration of the sheet
metal casing. It could also lead to puncturing an internal

refrigerant or water pipe. If necessary, however, the flow

center can be mounted to the sheet metal casing utilizing
four (4) self-drilling screws. (Pay close attention not to
puncture internal components.
)

flOw center mOuntinG

cautiOn

The following instructions represent

industry accepted installation practices for

closed-loop earth coupled (ground loop)

installations. Instructions are provided to

assist the contractor in installing trouble

free ground loops. These instructions are

recommendations only. State/provincial and

local codes MUST be followed and installation

MUST conform to ALL applicable codes. It is

the responsibility of the installing contractor

to determine and comply with ALL applicable

codes and regulations.

Advertising
This manual is related to the following products: