Installation instructions – Aarrow Fires Gas Stove User Manual

Page 20

Advertising
background image

ASSEMBLE RECEIVER

Important
The remote system is intended for use with original Aarrow parts only.

1) Carefully push the multi block connector on to the connection within the reciever unit as shown in Fig

17a. This connector can only fit one way, so ensure the slot in the recievers board lines up with the mould-

ing within the multi block connection.

2) Next, connect the angled spade connectors to the motor, note there are two different sized connectors and

these can only be fitted to the appropriate sized spade tab. The remaining narrow spade connectors fit to the

spade tabs on the micro switch. These are not handed, see Fig. 17b.

3) Place the double sided adhesive tape to the underside of the reciever unit. Slide back the cover and insert

the 4x AA/LR6 1.5v batteries into unit, observing the correct polartity as marked on the unit. Re-place

cover. Fig. 17c.

CAUTION! Ensure the batteries are inserted AFTER the motor is wired. A short circuit can

destroy the electrical components.

4) Position the reciever unit, as shown in Fig. 17d onto the space provided on the valve bracket. Affix the

underside of the unit with the double sided tape. Take care to route the wiring harness away from any hot

parts and do not obstruct the valve controls. The reciever unit works by ultrasonic so ensure that the reciev-

ing round grill is facing to the front of the stove.

20

Aarrow Sherborne GSL CF

INSTALLATION INSTRUCTIONS

Fig. 17a

Fig. 17b

SLOT

Fig. 17c

Fig. 17d

Advertising