2-1 Equipment Needed & Product Overview

1. Screw Bit (+) :107
2. Hex Sleeves 5mm
3. Hex Sleeves 8mm
4. Tweezers
5. Long Nose Nipper, Angle Cutting Nipper
6. Sider Cutter Pliers
7.

Projector

* Before you start: This process is protective level II. Operators should wear electrostatic chains.

* Note: - If you need to replace the main board, you have to get into service mode and record the

lamp usage hour. please refer to section 2-22.

- The disassembly and assembly process for P1166 / P1266 / P1266i / P1166P / P1266P is

the same . Here we take P1266 as an example.